Xiejiang River Project

Xiejiang River Project

Case Overview

        The main bridge of the Xiejiang River project is designed as a single-pylon, double-cable-plane prestressed concrete box girder cable-stayed bridge with a 52+78+160-meter span arrangement. It adopts a three-span continuous fixed system and dense spatial cable layout.

Case Images

Xiejiang River Project image 1