
Tiantian Expressway
Case Overview
For the Changhe Extra Large Bridge on Section 10 of the Tiantian Expressway, the superstructure adopts a 72+133+72-meter prestressed concrete partially cable-stayed bridge. The bridge uses a pylon-girder fixed and pier-girder separated system, vase-shaped solid piers, pile group foundations, and 408 box girders.
Case Images

