
Guangdong China Railway No.2 Engineering Bureau No.4 Engineering Co., Ltd. Extradosed Cable-Stayed Bridge Domestic
Beihai River Bridge on Guangdong Dongguan Urban Rail Transit Line 1
Project Overview
As a key control project of the entire line, the Beihai River Extradosed Cable-Stayed Bridge has a total length of 348 meters, adopting a pylon-beam consolidation and pier-beam separation system. The main pylon is an H-shaped tower body with a double-pylon double-cable-plane structure. The tower height is 26 meters, with a total of 16 pairs of stay cables.
Project Gallery
Related Projects
View All Projects
Extradosed Cable-Stayed Bridge
Xianhuahu Bridge on Anhui Jinzhai-Hefei Expressway
Anhui · China Gezhouba Group Co., Ltd.
View Project
Extradosed Cable-Stayed Bridge
Xin'anjiang Bridge on Zhejiang Jinhua to Jiande High-Speed Railway
Zhejiang · China Railway No.24 Engineering Bureau Group Co., Ltd.
View Project
Cable-Stayed Bridge
Fengxiang Bridge on Nanzhuang Avenue in Foshan, Guangdong
Guangdong · CCCC Roads & Bridges Construction Co., Ltd.
View Project