
Qiyun Bridge
Case Overview
Qiyun Bridge adopts an antisymmetric hybrid-pylon steel box girder cable-stayed structure with a 75+118+75-meter span arrangement. The Fuchun Avenue side span and main span use a one-way longitudinal gradient, while the approach bridge has a 3.5% gradient.
Case Images
